Home / Cases / Double production in the same building, realised during running operation

Double production in the same building, realised during running operation

Customer

Top Clean Wäscherei, Lohberg, DE

Laundry type

Hospitality, workwear, hygiene

Solution

Laundry Blueprint, internal logistics, WinWash® & Laundry Dashboard®

Result

Doubled production in same building

Double the production. Same building. Zero disruption. It is possible.

Top Clean Wäscherei in Lohberg has been serving customers across hospitality, healthcare and industry for decades. As the business continued to grow, so did the need for more production capacity. The challenge was clear: expand the operation without expanding the building.
At the same time, daily production had to continue. Stopping the laundry simply wasn’t an option.

The challenge

Increasing capacity while keeping production running requires more than new equipment. It demands detailed planning, tight coordination and complete control over every step of the project.

For Top Clean, the priority was clear:

  • Keep production running throughout the project
  • Minimize disruption for employees and customers
  • Maximize capacity within the existing facility

The solution

WSP developed a complete Laundry Blueprint: a detailed roadmap covering layout, logistics, process design and implementation.

Every phase was carefully planned before installation started. Hardware suppliers, contractors and internal teams worked from one integrated project plan, coordinated by WSP. This approach allowed the new installation to be implemented while the laundry remained fully operational.

The facility includes:

  • Sorting station
  • Bag rail systems
  • Conveyors, including cake breaker
  • Dryer feeders
  • Ironer feeders
  • Controls integrated in WinWash®
  • Performance monitoring with Laundry Dashboard®

All systems were integrated through WinWash, creating one central platform for operational control, logistics and production management.

The result

The project delivered exactly what Top Clean set out to achieve.

  • Production capacity doubled
  • No expansion of the existing building
  • Production continued throughout the implementation
  • One coordinated project from design to commissioning

By combining a well-designed Laundry Blueprint and implementation plan with structured project management, Top Clean transformed its laundry without interrupting its business.

Top Clean Wäscherei. Transformed.

CAPACITY

200%

increase in production

INSTALLATION

During running operation

CIRCUMSTANCES

Same building

Top Clean. Transformed.